I’m attempting to automate the change so as standing from “on-hold” to “pending cost” as soon as a product vendor has marked an order as fulfilled. At the moment, the default standing in “on-hold” when an order is created and solely as soon as the product is delivered should cost be required. Is it attainable to replace to the “pending” standing after an motion has been made?
Woocommerce – change order standing from on-hold to pending cost

